MEW Energy Efficiency Program in Kabul University Girl’s Dormitory (KVD) Lot 2

Survey, Procurement, Supply, installation, testing/commissioning and hand over of completed works.

Work includes a survey of the Electrical and Civil Works and Removal and Replacement of the following:

  •     All lighting fixtures with low-voltage replacements
  •     Water pumps with Solar Water Pump System
  •     Electrical Wiring as needed
  •     Circuit Breakers in Main Distribution Panel